Search Magazine

What we should build a house: an overview of 3...

What we should build a house: an overview of 3 variants of children's playhousesRemember your infancy. Remember, like you were playing in an adult life, in which you certainly had your own building? Let in fact it was just a little bit of a place near the table, curtained through only the world by an old veil. It seems that all this happened for no reason so long ago. And how many years have passed since that time! Now you already have to eat bait kids who are also dreaming about their own tiny little corner. Make it pleasant: build for their sake a woody naive house with their own hands. Try to do this work together. After all, common affairs and interests bring together and help in conversation.
Variation #1 - a house for the sake of small kids
The building, who we are going to build, is forced to exist very simply. This is proud. To perform it beautiful on both sides is allowed, if to show imagination, to work not only with your hands, but with your head. In short, your baby and you have a front of joint work. For the sake of the baby, this is a truly quite delightful repetition of adult life. Clutch must be done neatly. For this, it is necessary, so that the solution had a watery, rather elastic consistency. All gaps between the chocks should be carefully filled with
In order for the frame and masonry of the chumpkins to get a strong coupling, use nails (20cm). They should be hammered in pairs into the frame of the structure, alternating between them every 2-3 rows. For the sake of the doorway we put another log. We look due to the fact that all the intervals between the chocks on both sides of the wall were completely filled with matter. The walls are ready. So that the frame and the masonry were firmly fastened together, it is allowed to extract not only nails, but also long iron pins
Now we will build a floor. For this, chunks 10 cm long are necessary. Inside the structure, take out the land for 15 cm deep. For 5 cm we pour dust for the bottom of the formed pit. For him, very tightly, painstakingly selecting, laying chocks. Using a wide board and a hammer we ram them. The building of such a floor of wood chump is not an ordinary thing, but the result is worth the effort. After all, your kids will amuse your kids in the house.
We fill up the existing cracks with sand, then water should be poured with water near the head so that the dust fills the cracks and fixes the chocks firmly. We fill the gap with the substance of sand and cement. We leave the floor to dry, after that it should wash it perfectly, so that the paint of the wood species returns.
2nd floor of the wicker house
If the tree species for the sake of the lower floor was cut down before the beginning of the sap movement, then for the second floor, it is necessary to have a will, if the sokogan already agrees with them. Specifically, such a tree species is not at all difficult to release through the bark. Attach the logs to the frame with two hundredth studs. Intermediately, they should also be brought down in denser places. Do not forget about the door and window openings. In order to perform a gable roof, you need four smooth logs, from which you can construct rafters. On the sides of the house they are hammered, but for fixing they fix with screws. The trunks of the vine are not difficult to clean through the bark at the interval of the sod. Here of such cleaned branches and trunks and quite built the 2nd floor
The reeds for the roof take a very young. He is forced to grow in the spring, and it should be harvested in winter. Mowing the reeds better in the interval, if there is not enough snow, but saved and the sight of the reservoir is covered with ice. According to the ice, the hair slips, hence the reed is quite a failure to appear and look neat.
To lay the roof of reeds fix it through tightening with screws of 2 racks. Before, for the rafters, we place a crate, for it a reed of such thickness, like planned. Then, on top of the reeds, lay the rail and pull it together with the crate with long screws. In the same way we deal with all sides of the roof. The top of the structure is crowned with a hood, which by means of a wire is pressed against the rafters. Here, for no reason, the four-pitched roof covered with reeds looks. If everything is done in a hurry, the result of the work will amuse everyone
The frame can be covered with water-based paint. Hammocks are attached to a deliberately dug large log. However, it is permissible to use an old tree, the trunk of which is still quite reliable. Carefully, like to perform a woody naive house from among those materials that are near us, will tell a video.

Комментариев нет:

Отправить комментарий