Search Magazine

Technology of laying paving slabs with your own...

Technology of laying paving slabs with your own hands: analysis of nuancesBy improving the local area, some owners often wonder what to do with the paths, the preceding and the last yard, the recreation area ... The pavement board is perfect for these purposes. Functional coverage in the improvement of the terrain is not equal for itself. The value for matter in the distance is not fabulous, well, laying paving tiles with their own hands is quite ordinary in execution. It is unreasonable that the design of paths and sites for the site will not be extremely expensive, and with all this a pretty decent frame for the sake of the garden and decoration of the local area.
What is a good path for paving tiles?
This popular building material in the world has a whole lot of pluses.
Abundance of colors, shapes and textures
This allows you to make harmonic consent, integrating all the elements of the site into a complete picture, and embody any design and building plans. Due to its aesthetic appeal and good operational features, the paving slabs are irreplaceable in landscape design
Environmental friendliness and convenience
Sidewalk tiles do not emit harmful volatile substances to be heated and not softened by scorching sun rays. Sand interlaced seams allow to penetrate excess moisture and then rain, preventing the formation of puddles. The paved track does not violate the natural need of plants for the site in water and gas exchange
Simplicity of service and longevity
Sidewalk tile - impeccable coating in the conditions of frosty winters, it has a higher strength and low abrasion. Being a high-quality styling tile can last more than 15 years
Like the very development of laying paving slabs, causelessly and the future upbringing because of it, quite ordinary. In case of damage to the coating, you can always eat to return the part, picking up and replacing only fairly tiles.
For the sake of that paved paths and areas for the site have become not only an unusual addition to landscape design, and have regularly served in the course of many years, to be carrying out works proudly take into account the structure of the main points, like a true must lay paving slab. For example, depending on the location and purpose of the coating, the laying of paving slabs may exist designed for a solution, for no reason and for dust or rubble.
For the arrangement of garden paths and recreational areas it is enough to extract a sand-crushed stone"pillow"
Works according to the tile laying according to the steps
Select the tile and the tools you need
For the step of preparation for the laying of paving slabs, it is very proud to select products and the necessary tools from a wide range of products with which it is quite simple and comfortable to do. The choice of tiles should be recognized not only for taste preferences, but also take into account the operational properties of the material. For no reason, if you equip a rest area or a covered carport for the car, you should ask the manufacturer: is it possible for the tile to abstain from heavy construction or is only calculated for human authority. Refers to the error of the surface, the shape of the product: whether to eat the rebounds, whether it is necessary to cut it sufficiently
Base Conditioning
The reliability of the basic surface directly depends on the success of only construction. To be arranged on the basement on the sides of the location of the future path, pegs with notches are hammered for a height of 5-7 cm, for which a rope is stretched. From the construction site is removed the discharge of humus, pebbles and waste. For the sake of that, in order to kill all the paving slabs with your own hands, you must first prepare a base in a painstaking way
For the sake of leveling the surface of the contoured section in elevated places, an excessive discharge of the soil is removed, and for depressions, pits and basins, it is reversed and poured. The rake-leveled base is painstakingly tamped. To work with a soft ground, the desire to moisten the aligned view of the earth before water with water. A thorough tampering of the base will prevent the unevenness of the sidewalk sagging.
The abyss of the base is calculated with an allowance of a couple of cm, taking into account the fact that the consolidation always causes shrinkage. On average, for the laying of a layer of sand and the tile itself, it leaves in 20 before 30 cm. Then the excavation of the front side of the tile should result in an extraordinary height
The entire surface of the future track is given a transverse, longitudinal or longitudinal-transverse slope. For this step, arrangement of sites and tracks are also carried out in accordance with the laying of communications. Laying geotextiles before filling with sand will prevent the growth of weeds between tiles.
A"cushion"product made of sand or crushed stone
For the prepared basic discharge of soil is allowed to spread dust, who will not only improve the stability of the sidewalk, and rather walk in the role of a drainage system. Dusted out dust should be razed by rakes and watered at that time, until puddles are formed for its surface. Already after 3-4 hours of sunny weather, the"pillow"is allowed to add a smooth flat shape with the help of a profile, which can also be an ordinary pipe or support. For the smoothing of the surface of the sand layer it is allowed to use inch PVC pipes
Pipes are arranged according to the type of rails for a distance of 2-3 meters well-wisher through a friend. Gaps between them are filled with sand for a similar height, providing a flat for the entire length of the site.
For the sake of giving more strength to the paving slab it is also permissible to lay paving for a crushed stone base, for no reason and for a solution. For this, you must prepare a dry sandy-cement mash in the proportion of 3: 1. The mash is laid out with an even layer for the base, the screed is channeled. To work with"difficult"soils the desire to extract a combined laying consisting of a layer of cement-sandy consistency and concrete.
Installing pavers
Before laying pavers, you must pull the string-order according to the chamfer. The laying of paving slabs with their own hands is best to begin through the curb. The main formation is laid out strictly according to the cord. Tile spread in the direction of"away from yourself." You need to arrange the"bricks"so that they fit tightly the well-wisher to a friend
This will avoid increasing the width of the seams. The introduction of crosses will allow you to set equal intervals of 1-2 mm between the tiles. If the tile lays unevenly, it is permissible to remove with the help of a trowel or report a discharge of sand near it and then again tamper with it.
The paving slab should be ironed using the building height and kiyanku. According to the end of the works in accordance with the laying of the tile, the seams are filled with a layer of cement-sandy consistency and watered with water. For the sake of giving the path a more cautious and attractive appearance, the intertwining seams are allowed to"wipe"with quartz sand
Be shoddy docking tiles with other buildings or elements of landscape design, you can trim the edges with a grinder.
According to the end of work from the finished track, the waste and part of the sand are swept away. The curb installation for the watery M100 solution will prevent the loosening of the tiles and the"creeping"of the track.
In the upcoming quite a bit to update the water-washed dust in the cracks of the pavement. The path, decorated with paving tiles, is a pretty good decoration of the site.
Video master classes with stacking examples

Комментариев нет:

Отправить комментарий