Installing the wicket in the fence of the corrugated board: a short educational program on the installation technologyThe instinct of self-preservation inherent in each of us is manifested in the desire to protect our own building through threats. Fences, gates and gates are an indispensable element of protection. However, it is not alien to man to surround himself with beautiful objects. Therefore, it is logical that modern fencing elements, besides direct destination, also act as a decorative design of the site. A wicket from the profiled sheet installed by one's own hands is the only one of the most applicable variants of the creation of a reliable and aesthetically attractive design capable of decorating the parade area of the site. A profilist is like a building material Preliminary, than to operate a wicket, we suggest to be guided, in what advantages of a corrugated board before other more popular building materials for the sake of production of enclosing structures. Some of the main advantages of a proflist are: Good high-quality properties. The material of production is profile sheets that are covered by several protective layers: anticorrosive, and then on the outside with a polymer, and with an inner lacquer Simplicity and comfort of installation. This matter is impeccable for the arrangement of fences and wickets. Constructions from light and at the same time strong iron plates are allowed to erect only because of two or three days, which in turn speeds up and reduces the cost of construction. Built gates and fences from the profiled sheet look impressive and thorough. Aesthetic pleasantness. Wavy-bent iron plates can own very different colors. The use of a colored polymer coating to color the sheets of the profiled sheet allows you to be able to select the work of the desired color in order to execute the wicket, which is complementary to the accord, rather harmoniously with other construction facilities for the site. Long life building. The term of operation of structures equipped with trapezoidal sheet, can achieve more than 50 years. Thanks to a multi-stage processing of the matter has the highest anti-corrosion stubbornness and talent to save aesthetic pleasure even about the influence of UV radiation and weather criteria The main stages of production and installation Speech #1 - choosing a rational size Planning to execute a gate in the fence, it is proud to first determine the dimensions of the structure. The best width of the gate - less than 1 meter, height - less than 2 meters. A competent retribution will prevent the difficulties associated with the early wear of the hinges and the lock of the structure, as well as the inconvenience in the use of opening a wide sheet of canvas. In order to make a more dimensional construction, the moment that the weight increase of the casement can lead to accelerated wear of the locks and loops of the canvas. Being a gate with a height of more than 2 meters the frame of the structure is the desire to complement the top insert with the crossbar. This will make it possible to obtain in the finished form a solid road that not only closes the place above the gate, but also reduces the load for the bearing post. The #2 statement is the construction of the pillars For the sake of that in order to execute a strong gate made of corrugated board, which is regularly enough to serve for the next few 10 years, it is necessary to equip the racks for its sake. Iron pillars or poles made of stone or bricks can serve as support posts. It is proud to take care of the installation of racks due to deviations from the vertical position, which can lead to a skewed and broken performance of the finished product. Warn the sagging of the support post will help improve the foundation. The abyss of its bookmark is 1-1.5 meters In the excavated pit near the base, vertically in accordance with the level, the racks are installed and filled with substance from a small crushed stone of sand and cement. In the course of the next 7-10 days the concrete"stays"and freezes. < Step #3 - frame action It's easier to make a skeleton from a profiled iron pipe with a cross section of 60x30. In order to cut the blanks and weld the wicket, you will need a welding tool and a Bulgarian. Before cutting the tube for billet prodigy, there is it through the rust and scales with the iron brush attached to the grinder. After that, the pipe must be degreased with a solvent with a corrosion inhibiting composition. The installation should take into account the moment that the gap between the door leaf and the track cover or the sidewalk is forced to be more than 100mm Attention! Employee clearance is needed for the sake of the usual functioning of the structure, even to be an accumulation of ice in the winter period. Determining the size of the gate, you can start to make its frame. For the sake of this, for the profile pipe, it is worth noting the dimensions of the blanks and cut them by a Bulgarian at an angle of 45 degrees. The product of this chamfer will improve the property of the weld, making it virtually invisible at all. For the purpose of equipping the gate, two longitudinal parts are required, according to 1.75-1.9 m and 2-3 transverse details in accordance with 0.9-1 m. The parts are welded between 2-3 cm by stitches in accordance with the entire perimeter every 20-30 see Longitudinal and transverse pipes, in book number and central transverse tube, should occupy strictly perpendicular to each other. The gap between all horizontal elements should also exist identically. In order to increase the strength of the structure, it is permissible to lay the diagonal elements through the upper corner of the vestibule in the lower corner of the suspended rack In order to increase the strength of the gate, it is also possible to make the smallest frame of the same tubes 20x40 mm in size inside the frame. Warn the corruption of the frame in the process of welding through overheating is allowed through the implementation of stitches in staggered order. Then, like welded frame for the sake of the gate, we proceed to install additional parts - awnings, plates for the sake of attaching the lock and the outer handle. Triangular"kerchiefs"of iron sheet welded to the interconnected parts, will increase the strength properties of the entire structure A nice video-manual for beginners, like to weld a wicket:
Выступка #4 — установка ворота Потом окончания сварочных работ должен выполнить зачистку сварочных швов, грунтование покоробленных мест и расцветку каркаса. The profilist is freely attached to the frame by means of screws or rivets. The gap between the bindings depends on the owner's preferences: it is allowed to attach each wave of the sheet, and is allowed through one. The slightly fixing of the corrugated board to the middle bridge of the frame is indestructible. For the sake of fitting the gate it is permissible to extract classical iron loops, for no reason and new-fashioned polymer curtains. If iron pillars are used as pillars, then the veils are welded directly to them. To the brick or stone pillars, the hinges are fixed through welding to the profile pipe fixed with anchors or dowels for the pole. A ready wicket is allowed to hang for support and to test the work of the lock. For the sake of this so that the gate can not be opened for both sides, for the back support, a limiter from the corner is welded. The pretended bars will also cover the gaps between the gate posts and the canvas. City and gate from the proflist: video master class
Комментариев нет:
Отправить комментарий